Before assembly on the welding plate, in order to better determine the direction of the clamp, it is recommended to mark the fixing position first, then weld it, insert the lower part of the pipe clamp body, and place the pipe to be fixed. Put on the other half of the pipe clamp body and the cover plate, and tighten them with screws. Do not directly weld the base plate with pipe clamp installed.

Before assembly on the welding plate, in order to better determine the direction of the clamp, it is recommended to mark the fixing position first, then weld it, insert the lower part of the pipe clamp body, and place the pipe to be fixed. Put on the other half of the pipe clamp body and the cover plate, and tighten them with screws. Do not directly weld the base plate with pipe clamp installed.

For stack assembly, the guide rail can be welded on the foundation or fixed with screws. First install the upper and lower half of the pipe clamp body, put on the pipe to be fixed, and then put on the upper half of the pipe clamp body. Fix it with screws, and prevent it from rotating through the locking cover plate. Then install the second pipe clamp as above.

During the assembly of elbows, Yongsheng pipe clamps shall be used directly at the front and rear of elbows. It is suggested that such supporting points should be fixed.

logo

QUALITY FIRST, REPUTATION FIRST

Service hotline:

+86-513-83800188

ADD:No. 1077, Nanyuan West Road, Qidong City, Jiangsu Province

International Trade Department: +86-18912881958 Miss Wang
Market supervision: Mr. Pang +86-13962901281

Technical support: +86-513-83308050 Miss Zhang
After sales service: +86-13912440554 Mr. Lu

E-mail:  conexa@126.comqdqrce@126.com

ewm

Mobile website

Copyright © 2022 Qidong Qirun Conexa Joint Device Co.,Ltd.